Fuzzy repetitive scheduling for construction projects considering risk preferences and time-cost tradeoffs

模糊逻辑 调度(生产过程) 计算机科学 运筹学 风险分析(工程) 数学优化 运营管理 工程类 数学 业务 人工智能
作者
Xin Zou,Lihui Zhang
出处
期刊:Engineering, Construction and Architectural Management [Emerald Publishing Limited]
标识
DOI:10.1108/ecam-09-2023-0910
摘要

Purpose The purpose of this study is to develop a novel approach that addresses time-cost tradeoffs in repetitive construction projects while considering the uncertainty in activity durations and the risk preferences of planners. Design/methodology/approach Our study involves work in three aspects. Firstly, it employs triangular fuzzy numbers to represent activity durations in different units, which facilitates the management of scenarios characterized by limited historical data or the presence of ambiguous information. Secondly, it introduces a fuzzy chance-constrained programming model, which is aimed at minimizing the project budget while ensuring that the risks associated with cost overruns and schedule delays are confined to specified limits. Thirdly, it advances an enhanced genetic algorithm, integrating an electromagnetism-like mechanism and a scheduling repair process, to improve the efficiency and effectiveness of the optimization process. Findings A real-life street renovation project was analyzed to demonstrate the applicability of the proposed algorithm. The analysis explored three common types of risk preferences: risk-averse, risk-neutral and risk-loving. The results indicate that the proposed algorithm surpasses existing fuzzy repetitive scheduling methods in terms of risk management. It effectively generates schedules that align with the risk preferences of planners and provides worst-case estimates of project performance. Originality/value This research makes a significant contribution to the field by developing a fuzzy chance-constrained programming model and an associated optimization algorithm that is specifically designed for time-cost tradeoffs in repetitive construction projects. A key distinction is that this study considers the risk preferences of planners, which sets it apart from previously developed models. As a result, it provides a practical approach for effective risk management.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
1秒前
猪猪hero发布了新的文献求助10
4秒前
逍遥子0211完成签到,获得积分10
5秒前
6秒前
温馨家园完成签到 ,获得积分10
6秒前
needy发布了新的文献求助10
7秒前
8秒前
Miter完成签到,获得积分10
10秒前
11秒前
11秒前
玻璃弹珠发布了新的文献求助10
11秒前
大模型应助科研通管家采纳,获得10
11秒前
YifanWang应助科研通管家采纳,获得10
11秒前
英俊的铭应助科研通管家采纳,获得10
12秒前
香蕉觅云应助科研通管家采纳,获得10
12秒前
YifanWang应助科研通管家采纳,获得10
12秒前
12秒前
CodeCraft应助科研通管家采纳,获得10
12秒前
12秒前
12秒前
duktig完成签到 ,获得积分10
13秒前
万能图书馆应助火华采纳,获得10
17秒前
weslie完成签到,获得积分10
20秒前
乃春发布了新的文献求助20
21秒前
JJ完成签到 ,获得积分10
21秒前
可爱的函函应助维稳十年采纳,获得10
22秒前
22秒前
25秒前
独特的自中完成签到 ,获得积分10
27秒前
pupu发布了新的文献求助10
27秒前
领导范儿应助猪猪hero采纳,获得10
27秒前
28秒前
yangl完成签到 ,获得积分10
28秒前
小花发布了新的文献求助10
30秒前
彭于晏应助mmm采纳,获得10
31秒前
压缩完成签到 ,获得积分10
31秒前
传奇3应助wujia采纳,获得10
31秒前
32秒前
拾壹完成签到,获得积分10
33秒前
维稳十年发布了新的文献求助10
33秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
The Organometallic Chemistry of the Transition Metals 800
Chemistry and Physics of Carbon Volume 18 800
The Organometallic Chemistry of the Transition Metals 800
The formation of Australian attitudes towards China, 1918-1941 640
Signals, Systems, and Signal Processing 610
全相对论原子结构与含时波包动力学的理论研究--清华大学 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 物理 内科学 复合材料 催化作用 物理化学 光电子学 电极 细胞生物学 基因 无机化学
热门帖子
关注 科研通微信公众号,转发送积分 6440765
求助须知:如何正确求助?哪些是违规求助? 8254612
关于积分的说明 17571449
捐赠科研通 5498950
什么是DOI,文献DOI怎么找? 2900019
邀请新用户注册赠送积分活动 1876602
关于科研通互助平台的介绍 1716874