拖延
数学优化
作业车间调度
计算机科学
能源消耗
调度(生产过程)
流水车间调度
阻塞(统计)
高效能源利用
人口
分布式计算
实时计算
算法
工程类
数学
布线(电子设计自动化)
嵌入式系统
计算机网络
人口学
社会学
电气工程
作者
Fuqing Zhao,Zesong Xu,Haizhu Bao,Tianpeng Xu,Ningning Zhu,Jonrinaldi Jonrinaldi
标识
DOI:10.1016/j.cie.2023.109082
摘要
The distributed blocking flow-shop sequence-dependent scheduling problem (DBFSDSP) with the production efficiency measures has been extensively concerned as its wide industrial applications. Whereas, energy efficiency indicators are often ignored in the literature. The DBFSDSP considered makespan, total tardiness, and total energy consumption is investigated in this paper. A cooperative whale optimization algorithm (CWOA) is proposed to solve the DBFSDSP as the complexity of the distributed and multi-objective optimization. First, the critical path of DBFSDSP is defined. An energy-saving operation for the non-critical path is designed to reduce the energy consumption of the system. Second, an accelerated operation for the critical path is designed to reduce the makespan and total tardiness. Third, three acceptance criteria for multi-objective optimization are proposed to improve the diversity of the population. The statistical and computational experimentation in an extensive benchmark testified that the CWOA outperforms the state-of-the-art algorithms regarding efficiency and significance in solving DBFSDSP.
科研通智能强力驱动
Strongly Powered by AbleSci AI