装配线
圆锥截面
直线(几何图形)
运筹学
软件部署
计算机科学
多目标优化
工业工程
工程类
风险分析(工程)
机械工程
数学
几何学
医学
操作系统
机器学习
作者
Busra Nur Yetkin,Emin Kahya
摘要
Abstract The most important factor affecting efficiency and ergonomic risk levels in an assembly line design is the problem of assigning certain tasks to certain stations, namely the assembly line balancing problem. In the literature, assembly line balancing problem has often been studied, but studies that consider ergonomic risks are deficient. Recently, it has been one of the issues that have started to attract great attention with the realization of health problems caused by assembly lines. To this end, in this study, a bi‐objective mathematical model is developed that considers balancing assembly line station time and ergonomic risk levels, simultaneously. It is aimed to minimize both station time and the total deviations of ergonomic risk scores for the stations. Weighted sum and conic scalarization methods are applied to solve the bi‐objective model. To analyze the outcomes of the developed model, an application is proposed and tested on a real industrial case, at a home appliance assembly line. The deployment of the OMAX method is a contribution to the literature since it shows an analysis tool which evaluates the results of assembly line balancing. This method evaluates the performance of the stations based on different criteria such as station time and ergonomic risk. The number of high‐risk stations is obtained as 13 in the single‐objective model aiming to minimize the station time, while it is found to be nine in the bi‐objective model solved with CSM, without an increase in the total number of stations.
科研通智能强力驱动
Strongly Powered by AbleSci AI