受电弓
悬链线
火车
空气动力学
电流(流体)
计算机科学
海洋工程
汽车工程
模拟
工程类
机械工程
航空航天工程
结构工程
电气工程
地图学
地理
作者
Zhigang Liu,Yang Song,Shibin Gao,Hui Wang
出处
期刊:IEEE Transactions on Transportation Electrification
日期:2023-01-01
卷期号:: 1-1
被引量:18
标识
DOI:10.1109/tte.2023.3346379
摘要
In this survey paper, we comprehensively examine the ongoing research concerning the interaction between pantographs and catenaries, a vital aspect in ensuring uninterrupted electricity supply to trains. Future perspectives for future studies to ensure satisfactory performance at 400 km/h and above are preliminarily explored. Initially, this paper provides an overview of the current design and assessment system. A systematic survey on the numerical modelling of pantograph-catenary interaction is conducted. The applicability of current assessment quantities to speeds of 400 km/h and above is preliminarily investigated with a numerical model. The potential of optimising parameters for improving interaction performance is also explored at this speed level. The paper further reviews and preliminarily analyses the effects of common disturbances, such as geometric deviation and aerodynamics, on the pantograph-catenary interaction performance at 400 km/h and above. To prolong the expectancy life of the system, the paper also reviews contact wire wear prediction models and discusses their potential application at 400 km/h and above. Overall, this paper offers insights into the current state of research on pantograph-catenary interaction for high-speed railways and proposes future directions for improving the system to ensure optimal performance at speeds of 400 km/h and above.
科研通智能强力驱动
Strongly Powered by AbleSci AI