估计员
电力系统
观察员(物理)
标准差
计算机科学
功率(物理)
可扩展性
控制理论(社会学)
估计
通知
数学优化
数学
控制(管理)
工程类
统计
系统工程
量子力学
人工智能
物理
数据库
法学
政治学
作者
Shiqing Weng,Pindi Weng,Bo Chen,Shichao Liu,Li Yu
出处
期刊:IEEE Transactions on Circuits and Systems Ii-express Briefs
[Institute of Electrical and Electronics Engineers]
日期:2022-03-25
卷期号:69 (6): 3007-3011
被引量:25
标识
DOI:10.1109/tcsii.2022.3162239
摘要
This brief studies the distributed estimation problem for multi-area power systems where the sensor measurements encounter with false data injection (FDI) attacks. For the large load frequency control (LFC) power systems with unknown load deviation, a distributed intermediate observer based method is proposed to estimate the system states, FDI attack signals and load deviation of each area in the power system. In this case, the gain of each intermediate observer is obtained by constructing a self-relative linear matrix inequality that can be easily solved by the standard software packages. Notice that the computational cost of each estimator is low even though the scale of power systems is large. Finally, the effectiveness of the proposed method is verified by an illustrative example.
科研通智能强力驱动
Strongly Powered by AbleSci AI