Mahmoud Farajmandi,Mostafa Ali,Rick Hermann,Simaan AbouRizk
标识
DOI:10.1108/ecam-01-2019-0069
摘要
Purpose Properly planned module installation on an industrial site is a critical factor in delivering a project safely, on time and within budget. Different sizes of heavy-duty mobile cranes are used to pick, swing and place the modules. Crane selection depends on module size and weight, as well as crane availability, location and configuration. Weeks can be spent in trial and error to prepare and improve module installation plans due to the large number of ways to install the modules on site, high crane operating costs and other crane-module constraints. A tool to automatically generate module installation plans is essential. Design/methodology/approach This paper presents a novel heuristic-based methodology for planning and sequencing module installation on industrial construction sites that takes into account proposed technological constraints. Findings Case studies are presented to demonstrate the ease and effectiveness of the developed methodology in planning module installations. Originality/value On a complex project, the tool can save time in preparing the installation plan, while also reducing the amount of crane supporting tasks (foundation preparation and crane movement).
科研通智能强力驱动
Strongly Powered by AbleSci AI