调度(生产过程)
计算机科学
运筹学
工程类
运输工程
运营管理
作者
M Heidari,Seyyed‐Mahdi Hosseini‐Motlagh,Nariman Nikoo
出处
期刊:Transportation
[Springer Science+Business Media]
日期:2018-06-05
卷期号:47 (1): 417-443
被引量:16
标识
DOI:10.1007/s11116-018-9895-2
摘要
Due to the interaction among different planning levels and various travel demands during a day, the transit network planning is of great importance. In this paper, a bi-objective multi-period planning model is proposed for the synchronization of timetabling and vehicle scheduling. The main aim of the problem is to minimize the weighted transfer waiting time in the interchange stations along with the operational costs of vehicles. In order to demonstrate the effectiveness of the proposed integrated model, a real case study of Tehran subway is considered. The proposed model is solved by the e-constraint method and some outstanding results are achieved.
科研通智能强力驱动
Strongly Powered by AbleSci AI