流水车间调度
作业车间调度
禁忌搜索
数学优化
区间(图论)
计算机科学
上下界
调度(生产过程)
工作车间
时间复杂性
数学
算法
地铁列车时刻表
组合数学
操作系统
数学分析
出处
期刊:University of Modena and Reggio Emilia - IRIS UNIMORE
日期:1993-01-01
卷期号:44: 777-787
被引量:4
摘要
We consider Job-Shop and Flow-Shop scheduling problems with twomachines, no more than two operations per job and Time Lags i.e.a minimum time intervalbetween the completion time of the firstoperation and the starting time of the second one.We give complexity results for the preemptive and non preemptive casesand study the relationship between the two problems. For the Flow-Shopproblemwe give lower bounds, upper bounds and analyze their worst-caseperformances. Finally we define a Tabu Search algorithm and provethe effectiveness of the proposed bounds throughextensive computational results.
科研通智能强力驱动
Strongly Powered by AbleSci AI