海上风力发电
海洋工程
海底管道
制氢
生产(经济)
风力发电
环境科学
传输(电信)
功率(物理)
计算机科学
氢
海洋学
电气工程
地质学
工程类
电信
微观经济学
经济
物理
量子力学
作者
Cheng Hong,Yuxi Wang,Segen F. Estefen,Yuhong Wang
标识
DOI:10.1016/j.ijhydene.2024.02.107
摘要
Decentralized offshore wind power to hydrogen production is one of the potential solutions for wind energy utilization in deep sea area, of which the electrolysis is integrated with the wind turbine, so that how to gather and transport the produced hydrogen from the decentralized wind turbines to the processing terminals becomes very crucial. This paper focuses on this topic and proposes a mixed-integer linear programming model to optimize the layout of the "ship+pipe" transmission system, aiming at minimizing the average annual total cost. Through the model, the locations and sizes of hydrogen gathering platforms, their allocations with wind turbines, the shipping routes could all be figured out. Two aspects of contributions are made in this work. First, the concept of "Pipe + Ship" transmission mode is proposed, providing a feasible solution for offshore hydrogen transportation with long distance; Second, the proposed model integrates subsea pipe network and the sea level shipping route as a whole system, revealing their interactions. Case studies present the model's validity and feasibility as well as providing inspirations about the investment management.
科研通智能强力驱动
Strongly Powered by AbleSci AI