电
钥匙(锁)
计算机科学
电力系统
电力系统
数据中心
智能电网
网格
市电
电力需求
发电
需求预测
运筹学
大数据
需求响应
可持续发展
风险分析(工程)
功率(物理)
电网
电力
数据科学
数据建模
系统工程
环境经济学
分布式发电
人工智能
工程类
作者
Xin Chen,Xiaoyang Wang,Ana Colacelli,MinJoo Lee,Le Xie
标识
DOI:10.48550/arxiv.2509.07218
摘要
The rapid growth of artificial intelligence (AI) is driving an unprecedented increase in the electricity demand of AI data centers, raising emerging challenges for electric power grids. Understanding the characteristics of AI data center loads and their interactions with the grid is therefore critical for ensuring both reliable power system operation and sustainable AI development. This paper provides a comprehensive review and vision of this evolving landscape. Specifically, this paper (i) presents an overview of AI data center infrastructure and its key components, (ii) examines the key characteristics and patterns of electricity demand across the stages of model preparation, training, fine-tuning, and inference, (iii) analyzes the critical challenges that AI data center loads pose to power systems across three interrelated timescales, including long-term planning and interconnection, short-term operation and electricity markets, and real-time dynamics and stability, and (iv) discusses potential solutions from the perspectives of the grid, AI data centers, and AI end-users to address these challenges. By synthesizing current knowledge and outlining future directions, this review aims to guide research and development in support of the joint advancement of AI data centers and power systems toward reliable, efficient, and sustainable operation.
科研通智能强力驱动
Strongly Powered by AbleSci AI