堵塞
环境科学
环境工程
湿地
雨水
磷
水力停留时间
人工湿地
水文学(农业)
地下水流
停留时间(流体动力学)
废水
地表径流
化学
地质学
岩土工程
生态学
历史
考古
有机化学
生物
地下水
作者
Yaoping Chen,Kisoo Park,Siping Niu,Youngchul Kim
摘要
A half-saturated pilot-scale wetland planted with Acorus calamus was built to treat urban stormwater. The design comprises a sedimentation tank for pretreatment, and a vertical flow volcanic gravel wetland bed equipped with a recirculation device. Eighteen rainfall events were monitored in 2012. The treatment system achieved total removal efficiencies of 99.4, 81, 50, and 86% for suspended solids, organic matter, nitrogen and phosphorus, respectively, and 29, 68, and 25% for copper, zinc, and lead, respectively, at a 3-day hydraulic residence time. In the wetland bed, the removal of ammonia, total nitrogen, and zinc were improved by recirculation. Plant uptake provided 18% of nitrogen removal and 39% of phosphorus removal. During the experimental stage, only 1.4% of the pore volume in substrate was reduced due to clogging, implying that the wetland can operate without clogging for a relatively long period.
科研通智能强力驱动
Strongly Powered by AbleSci AI