海底
岩石爆破
钻孔和爆破
工程类
章节(排版)
隧道施工
钻探
励磁涌流
沉管
海洋工程
土木工程
石油工程
岩土工程
机械工程
计算机科学
操作系统
电气工程
变压器
电压
作者
Zhenyu Sun,Dingli Zhang,Qian Fang
标识
DOI:10.1016/j.tust.2023.105161
摘要
This paper reviews the progress made by our research team in the construction of large cross-section subsea tunnels using the drilling and blasting method. Our research on the prevention and control of water inrush during the construction period and the control of water leakage and discharge during the operational period is introduced. It includes a compound grouting technology for high permeable ground, an elaborate process control method for large cross-section tunnels and an active controlling waterproof-drainage system. These achievements were applied to the first two large cross-section subsea tunnels in China, namely the Xiamen Xiang’an Tunnel and the Qingdao Jiaozhou Bay Tunnel. Thereafter, the technical mode of subsea tunnel construction using the drilling and blasting method was established, providing a theoretical basis and systematic technical support for the safe construction of large cross-section subsea tunnels under complex conditions.
科研通智能强力驱动
Strongly Powered by AbleSci AI