Kalajida structure is located in hollow zone of central Ferghana Valley,Uzbekistan.It is buried deeply with the characteristics of ultra-high temperature and pressure,containing H2S and saturated salt water of high pressure at the objective interval with salt bed covering it,which make oil production test extremely hard.The authors have successfully recorded and evaluated the test dada of Kalajida structure by carefully designing test plan,optimizing its parameters,using downhole testing tools of high pressure and temperature resistance and anti sulphur,testing wellhead assembly and control system,and studying and applying the technique of oil production test under ultra-high pressure.The result proves that the technique has reached advanced world standard and absolutely applies to oil production test of sulfur-containing wells(6000m deep) with ultra-high pressure(140MPa) and high temperature(1500C).