亲爱的研友该休息了!由于当前在线用户较少,发布求助请尽量完整地填写文献信息,科研通机器人24小时在线,伴您度过漫漫科研夜!身体可是革命的本钱,早点休息,好梦!

Integrated scheduling optimization of production and transportation for precast component with delivery time window

调度(生产过程) 计算机科学 预制混凝土 卡车 运筹学 运输工程 工程类 运营管理 汽车工程 土木工程
作者
Yiran Dan,Guiwen Liu
出处
期刊:Engineering, Construction and Architectural Management [Emerald Publishing Limited]
卷期号:31 (8): 3335-3355 被引量:20
标识
DOI:10.1108/ecam-09-2022-0871
摘要

Purpose Production and transportation of precast components, as two continuous service stages of a precast plant, play an important role in meeting customer needs and controlling costs. However, there is still a lack of production and transportation scheduling methods that comprehensively consider delivery timeliness and transportation economy. This article aims to study the integrated scheduling optimization problem of in-plant flowshop production and off-plant transportation under the consideration of practical constraints of customer order delivery time window, and seek an optimal scheduling method that balances delivery timeliness and transportation economy. Design/methodology/approach In this study, an integrated scheduling optimization model of flowshop production and transportation for precast components with delivery time windows is established, which describes the relationship between production and transportation and handles transportation constraints under the premise of balancing delivery timeliness and transportation economy. Then a genetic algorithm is designed to solve this model. It realizes the integrated scheduling of production and transportation through double-layer chromosome coding. A program is designed to realize the solution process. Finally, the validity of the model is proved by the calculation of actual enterprise data. Findings The optimized scheduling scheme can not only meet the on-time delivery, but also improve the truck loading rate and reduce the total cost, composed of early cost in plant, delivery penalty cost and transportation cost. In the model validation, the optimal scheduling scheme uses one less truck than the traditional EDD scheme (saving 20% of the transportation cost), and the total cost can be saved by 17.22%. Originality/value This study clarifies the relationship between the production and transportation of precast components and establishes the integrated scheduling optimization model and its solution algorithm. Different from previous studies, the proposed optimization model can balance the timeliness and economy of production and transportation for precast components.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
4秒前
饱满如风发布了新的文献求助10
5秒前
8秒前
吴迪应助hhhle采纳,获得30
12秒前
LY完成签到,获得积分10
12秒前
LY发布了新的文献求助10
14秒前
慕青应助饱满如风采纳,获得10
15秒前
Ablebolt发布了新的文献求助10
17秒前
田様应助竹叶听清采纳,获得10
18秒前
19秒前
大气的湘完成签到,获得积分10
21秒前
充电宝应助tracy_5114采纳,获得10
23秒前
23秒前
25秒前
29秒前
饱满如风发布了新的文献求助10
31秒前
36秒前
36秒前
布干维尔岛耐摔王完成签到,获得积分10
37秒前
是真的宇航员啊完成签到,获得积分10
37秒前
LCFXR发布了新的文献求助10
40秒前
小华发布了新的文献求助30
40秒前
竹叶听清发布了新的文献求助10
41秒前
饱满如风完成签到,获得积分20
41秒前
小鸟芋圆露露完成签到 ,获得积分10
42秒前
mmyhn发布了新的文献求助10
42秒前
47秒前
动听的诗翠完成签到,获得积分10
51秒前
51秒前
是椰发布了新的文献求助10
56秒前
UPUP0707发布了新的文献求助10
1分钟前
所所应助是椰采纳,获得10
1分钟前
JamesPei应助科研渣渣采纳,获得10
1分钟前
打打应助科研通管家采纳,获得10
1分钟前
1分钟前
1分钟前
1分钟前
1分钟前
含蓄音响完成签到,获得积分10
1分钟前
共享精神应助小华采纳,获得10
1分钟前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Les chinois de jakarta: temples et vie collective 1000
Autoparametric Resonance in Mechanical Systems 1000
基于锂离子电池正极材料回收的绿色溶剂开发及工程化应用研究 800
Social Psychology 600
Cosmos as Art Object: Studies in Plato's Timaeus and Other Dialogues 600
Management and the Arts 510
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 内科学 物理 复合材料 催化作用 细胞生物学 无机化学 光电子学 物理化学 电极 基因
热门帖子
关注 科研通微信公众号,转发送积分 7645549
求助须知:如何正确求助?哪些是违规求助? 9218057
关于积分的说明 19777718
捐赠科研通 7210208
什么是DOI,文献DOI怎么找? 3276886
关于科研通互助平台的介绍 2438554
邀请新用户注册赠送积分活动 2274961