Nikolaos Patronis,A. Mengoni,S. Goula,O. Aberle,V. Alcayne,Saverio Altieri,S. Amaducci,J. Andrzejewski,V. Babiano-Suárez,M. Bacak,J. Balibrea-Correa,Chiara Beltrami,S. Bennett,A. P. Bernardes,E. Berthoumieux,R. Beyer,M. Boromiza,D. Bosnar,M. Caamaño,F. Calviño
标识
DOI:10.1140/epjti/s40485-023-00100-w
摘要
During the second long shutdown period of the CERN accelerator complex (LS2, 2019-2021), several upgrade activities took place at the n_TOF facility. The most important have been the replacement of the spallation target with a next generation nitrogen-cooled lead target. Additionally, a new experimental area, at a very short distance from the target assembly (the NEAR Station) was established. In this paper, the core commissioning actions of the new installations are described. The improvement in the n_TOF infrastructure was accompanied by several detector development projects. All these upgrade actions are discussed, focusing mostly on the future perspectives of the n_TOF facility. Furthermore, some indicative current and future measurements are briefly reported.
科研通智能强力驱动
Strongly Powered by AbleSci AI