Design, Test, and Simulation of Lunar and Mars Landing Pad Soil Stabilization Built with In Situ Rock Utilization

火星探测计划 触地 风化土 地质学 羽流 登月 软着陆 火星登陆 航空航天工程 天体生物学 火星探测 工程类 气象学 考古 宏观经济学 生物 阿波罗 经济 历史 物理 动物
作者
Paul J. van Susante,Philip T. Metzger
标识
DOI:10.1061/9780784479971.060
摘要

© 2016 American Society of Civil Engineers. For repeated missions to develop infrastructure on the Moon and Mars, repeated visits to the same location will be required and landing pads will be a necessity. On the Moon these landing pads would prevent the regolith dust from sandblasting other infrastructure at 3 km/s and spreading dust all over the Moon and even into lunar orbit. On Mars the landing pads would prevent the lander exhaust plume from excavating a large hole under the lander, melting possible ice and possibly tipping the lander on its side resulting in damaging the lander. These landing pads would have to be built by robotic means before the human sized missions would arrive. To design these robots, it is necessary to determine what the landing pad could be made of and how they could be constructed. Various ISRU approaches have been suggested and studied for the center zone of the landing pad where the hot hyper velocity exhaust gases would contact the landing pad directly. A landing pad would provide a stable landing zone for touchdown of the lander and effective deflection of the exhaust plume without excavating a hole under the lander. This deflected (now horizontal flowing) plume would still scour the immediate area (secondary zone) next to the central landing zone and pick up the dust particles there. The secondary zone has a much larger surface area that needs to be stabilized and thus it would be beneficial to use in situ materials. Various options can be considered such as sintering, tiles, rock cover, and others. This paper will focus on tests performed on rock stabilized zones and their layering and on a method to model the in situ collected and constructed rock cover needed to lock in the regolith dust. The test setup, several tests and the results will be discussed. In addition, a first order model will be discussed to determine the maximum size rock needed to lock underlying layers in place during landing and take-off rocket exhaust plume loading cases.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
丘比特应助花露水采纳,获得10
1秒前
无私安柏发布了新的文献求助10
1秒前
在水一方应助冷傲的绿柳采纳,获得10
2秒前
勤恳寄凡完成签到,获得积分10
2秒前
aaaaaah完成签到,获得积分10
3秒前
小迪完成签到 ,获得积分10
3秒前
缥缈不言完成签到,获得积分10
3秒前
3秒前
ZYX完成签到,获得积分10
4秒前
大意的罡完成签到,获得积分10
4秒前
酷波er应助zhou采纳,获得10
4秒前
omega发布了新的文献求助10
4秒前
Huang完成签到 ,获得积分0
4秒前
4秒前
5秒前
传统的迎南完成签到,获得积分10
6秒前
白开水完成签到,获得积分10
6秒前
6秒前
hhhhwe000关注了科研通微信公众号
7秒前
7秒前
辣椒油发布了新的文献求助10
7秒前
8秒前
dxl完成签到,获得积分10
8秒前
liyang999发布了新的文献求助30
8秒前
无私安柏完成签到,获得积分10
9秒前
10秒前
舒克发布了新的文献求助10
11秒前
12秒前
缥缈不言关注了科研通微信公众号
12秒前
花露水发布了新的文献求助10
12秒前
biovhys完成签到,获得积分10
12秒前
ADDDGDD发布了新的文献求助10
13秒前
科研小白完成签到,获得积分20
13秒前
科研通AI2S应助甜口鱼采纳,获得10
14秒前
田様应助omega采纳,获得10
14秒前
14秒前
青铜完成签到,获得积分10
15秒前
洢桐龢晏关注了科研通微信公众号
15秒前
16秒前
我是老大应助痴情的向露采纳,获得10
17秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
Development Across Adulthood 800
Chemistry and Physics of Carbon Volume 18 800
The Organometallic Chemistry of the Transition Metals 800
The formation of Australian attitudes towards China, 1918-1941 640
Signals, Systems, and Signal Processing 610
天津市智库成果选编 600
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 物理 内科学 复合材料 催化作用 物理化学 光电子学 电极 细胞生物学 基因 无机化学
热门帖子
关注 科研通微信公众号,转发送积分 6445438
求助须知:如何正确求助?哪些是违规求助? 8259104
关于积分的说明 17593916
捐赠科研通 5505505
什么是DOI,文献DOI怎么找? 2901729
邀请新用户注册赠送积分活动 1878735
关于科研通互助平台的介绍 1718611