To compromise the conflict of flood control and hydroelectric energy production, two different flood control plans of the first cascade step power station were suggested ,based on the regularity of precipitation and flood in the Gutianxi Basin .The two plans consider the effect of short time forecasting . Through the calculation of the design floods whose return time is 1000 years and the comparison between the plans with forecasting and without forecasting ,we know the limited level of reservoir in flood season could be raised 1 meter when forecasting is considered.