烟囱(机车)
拆毁
岩石爆破
冷却塔
钢筋混凝土
塔楼
工程类
结构工程
岩土工程
作者
Shun Xiang Xu,De Zhi Chen
出处
期刊:Applied Mechanics and Materials
[Trans Tech Publications, Ltd.]
日期:2012-10-01
卷期号:: 640-644
标识
DOI:10.4028/www.scientific.net/amm.204-208.640
摘要
This paper describes the successful experience of the directional control blasting demolition of 150m-high reinforced concrete chimney and 75m cooling tower of Shizuishan Power Plant in Ningxia. It emphatically describes the pretreatment measures, blasting cut shape and size, blasting parameters, detonating network and blasting safety technology of the directional window, oriented window and load reducing slot. This paper provides the method for opening the overlarge arch oriented window, opening the special-shape load reducing slot and dense mesh safety net cross-multilayer coverage as well as comprehensive protection method for anti-flyrock splash and vibration reduction. Especially, the blast holes for opening the special-shape load reducing slot and the herringbone column are centralized at the bottom and top, which not only reduces the drilling workload, but also reduces the maximum detonating explosive amount of single section, and also reduces the safety protection workload.
科研通智能强力驱动
Strongly Powered by AbleSci AI