制氢
阳极
环境科学
氢
级联
工艺工程
电
发电
光伏系统
调度(生产过程)
碳纤维
天然气
能量载体
废物管理
网格
连续生产
汽车工程
市电
氢燃料
可再生能源
生产(经济)
营业成本
计算机科学
核工程
电力系统
环境工程
温室气体
能源消耗
材料科学
工业生产
电力转天然气
能源供应
燃烧
作者
Hongyue Deng,Huizhen Wan,Xu Li,Jia Xu,Chuanchao Zhao,Jiying Liu,Bo Gao
出处
期刊:Energies
[Multidisciplinary Digital Publishing Institute]
日期:2026-08-22
卷期号:19 (17): 3948-3948
被引量:1
摘要
Continuous carbon anode roasting in industrial parks requires a stable high-temperature heat supply and remains highly dependent on grid electricity and natural gas. However, existing energy-system studies rarely coordinate hydrogen production and storage, volumetric hydrogen blending, and temperature-graded waste-heat recovery under continuous production constraints. To address this gap, this study proposes an electricity–heat–gas–hydrogen integrated energy system for carbon anode industrial parks and develops a 24 h multi-objective scheduling model. The model coordinates heat demands at different temperature levels with hourly electricity and hydrogen flows, using surplus photovoltaic power to produce hydrogen for later high-load periods. The selected scheme achieves a daily volumetric hydrogen-blending ratio of 10.79%, with an operating cost of 82,985.75 CNY and carbon emissions of 54,371.53 kg. Relative to an otherwise equivalent non-hydrogen configuration, hydrogen coupling provides additional reductions of 7.2% in operating cost and 2.3% in carbon emissions. Compared with a basic conventional configuration, operating cost and carbon emissions decrease by 27.9% and 26.0%, respectively. Cascade recovery also increases the daily waste-heat utilization rate by approximately 30 percentage points. These results show that the proposed scheduling framework can coordinate hydrogen utilization and graded waste-heat recovery while maintaining continuous carbon anode production.
科研通智能强力驱动
Strongly Powered by AbleSci AI