Yanning Wang,Le-Chen Wang,Lin‐Shuang Zhao
出处
期刊:Proceedings of the Institution of Civil Engineers
[Thomas Telford Ltd.]
日期:2023-02-16
卷期号:: 1-13
被引量:1
标识
DOI:10.1680/jgeen.22.00200
摘要
The settlement performance of an immersed tunnel in the Hong Kong–Zhuhai–Macau Bridge (HZMB) transportation project is described. The geological profile underlying the immersed tunnel is presented and the corresponding field monitoring system is introduced. The function of semi-rigid elements is analysed. The observed results related to longitudinal deformation patterns during construction (e.g. long-term settlement, differential settlement and structural behaviour) are described and analysed. Differential settlement occurred when there was a large variation in soil properties, at the joints of two adjacent elements and in different segments of the same element. Differential settlement occurred in both the longitudinal and transverse direction. During the operational period, permanent settlement was strongly related to back-silting. Tide loading and the immersion of adjacent elements may have caused transient settlement related to elastic deformation, but tide loading had less influence on the permanent settlement.
科研通智能强力驱动
Strongly Powered by AbleSci AI