装配线
序列(生物学)
算法
整数规划
集合(抽象数据类型)
计算机科学
线性规划
数学优化
渡线
工程类
数学
人工智能
机械工程
生物
遗传学
程序设计语言
作者
Zikai Zhang,Qiuhua Tang,Dayong Han,Zixiang Li
标识
DOI:10.1080/0305215x.2022.2067992
摘要
In multi-manned assembly lines, more than one operator is allowed on the same workstation. Limited research has been carried out on sequence-dependent set-up times. Therefore, this article optimizes the multi-manned assembly line balancing problem with sequence-dependent set-up times using an enhanced migrating birds optimization (EMBO) algorithm. Sequence-dependent set-up times are embedded in two ways: forward and backward set-ups. EMBO designs a mixed neighbourhood search and acceptance criteria to help it escape from local optima, and a diversification mechanism to enhance the global exploration ability. Three types of experiment and two scenarios, with low and high set-up times, are conducted to test the performance of the mixed-integer linear programming (MILP) model and EMBO. The first experiment compares three MILP models (no, low and high set-up times) to illustrate the significance of set-up times. The final two experiments demonstrate the effectiveness of EMBO by comparison with the MILP model and six state-of-the-art methods.
科研通智能强力驱动
Strongly Powered by AbleSci AI