索引(排版)
过程(计算)
计算机科学
相似性(几何)
基于案例的推理
成本估算
起飞
对象(语法)
单位成本
数据挖掘
工程类
人工智能
系统工程
机械工程
图像(数学)
万维网
航空航天工程
操作系统
摘要
The paper presents an example ofcost estimation in the early phase of the project. The fragment of relative database containing solution, descriptions, geometry of construction object and unit cost of sports facilities was shown. The Index Cost Estimate Based BIM method calculationswith use of Case Based Reasoning were presented, too. The article presentslocal and global similarity measurement and example of BIM based quantity takeoff process. The outcome of cost calculations based on CBR method was presented as a final result of calculations.
科研通智能强力驱动
Strongly Powered by AbleSci AI