超导磁体
磁铁
超导线圈
超导电性
核工程
材料科学
机械工程
核磁共振
物理
凝聚态物理
工程类
作者
Hyung−Jun Kim,Chen-yu Gung,Florian Pasdeloup,Egor Marushin,N. Clayton,Jaromir Farek,Naoyuki Sato,Carole Torgerson,Giobatta Lanfranco,Patrick Petit,J. Reich
标识
DOI:10.1109/tasc.2024.3366158
摘要
The assembly of the feeder machine joint has started under challenging conditions, making it difficult to meet the stringent requirements. The challenges of making machine joints and their surrounding support structure in an industrial environment must be successfully overcome. The quality of the worker skills and process control is managed through a rigorous training and qualification program as well as tool acceptance testing. Full-scale mock-ups provide candidate workers with valuable experience in an environment similar to the construction site. The first-of-a-kind assembly on the segmented superconducting busbars and surrounding structural parts is progressing using an approach in which risks are identified, assessed, and prioritized. Lessons learned during the construction of the ITER machine joints are implemented in subsequent assemblies. Status of the construction on the first-ever feeder joint assembly is reported.
科研通智能强力驱动
Strongly Powered by AbleSci AI