可调度发电
虚拟发电厂
网格
可再生能源
计算机科学
动态需求
分布式计算
集合(抽象数据类型)
发电机(电路理论)
控制工程
分布式发电
功率(物理)
电气工程
工程类
数学
几何学
程序设计语言
物理
量子力学
作者
Bogdan Marinescu,Oriol Gomis‐Bellmunt,Florian Dörfler,Horst Schulte,Lukas Sigrist
出处
期刊:IEEE Access
[Institute of Electrical and Electronics Engineers]
日期:2022-01-01
卷期号:10: 104980-104995
被引量:59
标识
DOI:10.1109/access.2022.3205731
摘要
The concept of Virtual Power Plant (VPP) has arisen over a decade ago from the relatively low competitiveness of the back then emerging non-dispatchable RES. A set of smaller generators imitates the behavior of large synchronous generators. So far, static aspects such as generation or slow dynamics have been of interest, as it is the case for the zonal secondary frequency control scheme in Spain, which can be viewed as a VPP. However, considering dynamic aspects is of high importance, especially to further increase the current penetration level of Renewable Energy Sources (RES). Indeed, one should deal with the full participation of RES in grid ancillary services. This means not only to get some positive impact on grid voltage and frequency dynamics but to bring concepts which allow integrating RES to existing secondary regulation schemes on the same level as classic synchronous generators. For that, we propose here a new concept called Dynamic VPP (DVPP) which fully integrates the dynamic aspects at all levels: locally (for each RES generator), globally (for grid ancillary services and interaction with other close-by elements of the grid) and economically (for internal optimal dispatch and participation in electricity markets). A DVPP is a set of dispatchable and non-dispatchable RES along with a set of common control and operation procedures. The latter procedures include the choice of dispatchable and non-dispatchable RES constituting the DVPP, the control of DVPP generators for local objectives and participation of the DVPP as a single unit in ancillary services (especially in case of loss of natural resources - e.g., wind, sun - on a part of the DVPP), the limitation of the risk of adversely interaction with close-by elements and the feasibility in both current power systems scenarios and future ones with large share of RES. This new DVPP framework and approaches developed for its implementation allows ensuring optimal operation of a mixed portfolio of dispatchable and non-dispatchable RES generators for planning, participation to the markets and real-time control. For the control, all time-scale dynamics are considered to improve RES management (internal re-dispatch inside the DVPP to take advantage of dispatchable/non-dispatchable nature of each RES and to optimally manage the lack of natural resources in some regions of the DVPP) and their participation to grid ancillary services. Concrete structures of DVPP as well as ways to address the other control and economical aspects will be shown. This new DVPP concept is now under development in the H2020 POSYTYF project (https://posytyf-h2020.eu/).
科研通智能强力驱动
Strongly Powered by AbleSci AI