异步(计算机编程)
贝叶斯概率
计算机科学
国家(计算机科学)
米
智能电表
估计
贝叶斯估计量
数据挖掘
工程类
人工智能
智能电网
算法
异步通信
系统工程
电信
电气工程
物理
天文
作者
Sayantan Chatterjee,Soumyajit Ghosh,Saikat Chakrabarti,Abheejeet Mohapatra
标识
DOI:10.1109/tim.2025.3577850
摘要
Smart Meters (SMs) are pivotal in improving the accuracy of Distribution System State Estimation (DSSE) in the modern-day monitoring and control paradigm. Due to limited communication bandwidth or signal strength, the synchronized data conveyance from SMs to the control center remains an onerous task. Performing DSSE using non-synchronized SMs introduces asynchrony errors, which affect estimation accuracy. Towards this objective, a Gated Recurrent Unit (GRU) based SM data forecasting is implemented to facilitate SM data imputation, thereby mitigating SM asynchrony. Simultaneously, the effect of Out-of-Date (OD) variance incurred due to SM asynchrony, given the node load changes, needs to be priorly detected and iteratively updated to improve estimation results. This burdensome task gets eliminated by adopting Variational Bayesian (VB) approximation over the Cubature Information Filter (VB-ACIF), which can intrinsically adapt the unknown measurement uncertainties incurred by the SM OD variances. Numeric results from test systems reveal that Forecasting Aided-DSSE (FA-DSSE) using VB-ACIF delivers improved estimation accuracy and is suitable for practical distribution system operation. The proposed estimator’s robustness in dealing with multiple anomalies and correlated data communication failure is also validated for the proposed FA-DSSE framework.
科研通智能强力驱动
Strongly Powered by AbleSci AI