高效能源利用
能量(信号处理)
控制理论(社会学)
控制系统
项目调试
控制(管理)
工艺工程
控制工程
环境科学
计算机科学
工程类
数学
电气工程
人工智能
统计
出版
政治学
法学
作者
Young-Hum Cho,Mingsheng Liu
摘要
This paper discusses the implementation of the innovative technologies for variable-air-volume (VAV) systems in a Continuous Commissioning (CC®). The implemented building is a 5-story office facility with a total floor area of 8472 square meters, most of which is open space. An energy audit was conducted to evaluate the building's energy performance and identify potential cost-effective energy saving opportunities. Specific CC® measures were implemented in the building. This paper presents procedures, implementations and detailed descriptions of control sequence and operation comparisons for the terminal boxes and air-handling units (AHUs), as well as the chilled water system and hot water system. The results show CC® can improve building operations and reduce energy costs. The energy report shows the electricity savings of 26.8% and gas savings of 47.8% on an average. Copyright © 2010 John Wiley & Sons, Ltd.
科研通智能强力驱动
Strongly Powered by AbleSci AI