吸附
电化学
活性炭
饱和(图论)
苯酚
化学工程
再生(生物学)
介孔材料
化学
多孔性
污染物
废水
材料科学
制浆造纸工业
环境工程
环境科学
催化作用
有机化学
电极
细胞生物学
组合数学
工程类
物理化学
生物
数学
作者
Orlando García-Rodríguez,Audrey Villot,Hugo Olvera‐Vargas,Claire Gérente,Yves Andrès,Olivier Lefebvre
出处
期刊:Carbon
[Elsevier BV]
日期:2020-08-01
卷期号:163: 265-275
被引量:28
标识
DOI:10.1016/j.carbon.2020.02.041
摘要
The removal of non-biodegradable organics from industrial wastewater through adsorption onto activated carbon (AC) is a simple, effective and inexpensive process; however, as with any separation technology there is a need to regenerate the exhausted material. Here, electrochemical regeneration of AC was carried out in a single reactor alternating sequences of adsorption and regeneration. A key finding was that the contaminant (phenol here, as an industrially-relevant pollutant) saturation level of AC in the reactor directly impacts the efficiency of electrochemical regeneration. The regeneration efficiency was 20% lower and unstable with fully saturated AC, which could be explained by different phenol degradation pathways; upon reaching the exhaustion capacity of the reactor, electrochemical regeneration yielded recalcitrant polymers, whereas full mineralization could take place as long as the breakthrough capacity was not exceeded, even removing impurities originally present in the material. This cleaning effect further led to a change of porosity towards mesopores, which further improved mass transfers and resulted in sustained regeneration efficiencies close to 100%, sustained over 10 consecutive cycles. Under optimal conditions, it was thus possible to achieve over 97% phenol removal with energy consumption below 1 kWh kg−1 of AC, outcompeting traditional regeneration processes.
科研通智能强力驱动
Strongly Powered by AbleSci AI