预制混凝土
调度(生产过程)
地铁列车时刻表
持续时间(音乐)
效率低下
计算机科学
时间轴
软件部署
概率逻辑
生产计划
工程类
预制
生产进度表
生产(经济)
运筹学
工业工程
关键路径法
批量生产
系统工程
工作车间
项目管理
联营
建筑工程
平面图(考古学)
提前期
作者
Jeeyoung Lim,Sunkuk Kim
标识
DOI:10.1016/j.asej.2026.104022
摘要
The construction industry faces persistent challenges of inefficiency and fragmentation. In precast concrete (PC) projects, in-situ production and yard-stock management require precise coordination of production cycles, storage layouts, and installation schedules, yet existing studies have rarely addressed their integrated optimization. This study proposes a BIM-driven scheduling optimization framework that incorporates probabilistic simulation (Oracle Crystal Ball) into BIM-based 4D modeling. The framework was applied to steel-reinforced precast concrete components in a large-scale logistics project, with the aim of minimizing project duration and improving yard-stock efficiency under site-specific constraints. Simulation results demonstrated a strong positive correlation between lead-time and project duration (+0.58), identifying lead-time control as a critical scheduling variable. A negative correlation between duration and yard-stock area (–0.52) confirmed that timely mold utilization improves spatial efficiency, while crane deployment showed minimal impact. The optimized schedule achieved 6.3 months, reducing the original 8-month plan by 10% and surpassing the client’s contractual timeline by 75%. This research contributes by introducing one of the first BIM-based frameworks that integrates production, storage, and installation into a unified scheduling model, providing both practical decision support and a foundation for future objective optimization.
科研通智能强力驱动
Strongly Powered by AbleSci AI