定性比较分析
普通合伙企业
可持续发展
收费公路
比例(比率)
超级目标
标杆管理
公私合营
业务
伤亡人数
规范性
鉴定(生物学)
环境经济学
过程管理
环境资源管理
经济
计算机科学
营销
政治学
财务
机器学习
物理
生物
社会心理学
量子力学
法学
植物
遗传学
心理学
作者
Gabriel Castelblanco,José Guevara,Diego Rojas,Juan Correa,Koen Verhoest
标识
DOI:10.1061/jmenea.meeng-5015
摘要
Public–private partnership (PPP) has been positioned as a relevant contracting method for developing large-scale infrastructure projects that entails potentially high-magnitude negative impacts on the environment. The effectiveness of the environmental impact assessment (EIA) is crucial to achieving sustainable development of these large-scale infrastructure projects. To unravel the drivers for the EIA effectiveness and the multiple combinations built by the complexity of these drivers, this paper analyzes 28 road PPP projects from Colombia employing a fuzzy-set qualitative comparative analysis (fsQCA) approach. This paper decodes conjectural causal links between specific conditions grouped in superordinate clusters (i.e., consultants' capability, project features, and communities' participation) and EIA effectiveness dimensions (i.e., normative, procedural, substantive, and transactive). Findings revealed that no single combination of causal conditions ensures multidimensional EIA effectiveness. This study demonstrated that EIA effectiveness relies significantly on the integration of specific features of three external stakeholders: consultants, nonpreferred proponents, and communities. This study constitutes the first empirical multidimensional identification of the combination of conditions that generate EIA effectiveness in road PPPs.
科研通智能强力驱动
Strongly Powered by AbleSci AI