强化学习
计算机科学
电磁线圈
钢筋
调度(生产过程)
仓库
工程类
人工智能
结构工程
运营管理
电气工程
业务
营销
作者
Sanghyun Cho,Woo-Jin Shin,Jeongsun Ahn,Sanghyun Joo,Hyun-Jung Kim
标识
DOI:10.1109/icra57147.2024.10610858
摘要
This paper tackles the dynamic crane scheduling problem in a steel coil warehouse, involving tasks such as coil storage, retrieval, and shuffling. Tasks arrive dynamically with precedence relations, while multiple cranes share a track, necessitating collision avoidance. We aim to minimize the average task waiting time by allocating tasks to cranes and optimizing their execution sequence. Unlike prior research focusing on static scenarios or rule-based heuristics, we introduce a real-time, reinforcement learning-based algorithm. We propose a policy network based on graph neural networks to effectively handle precedence relations and global information. Experimental results demonstrate its superiority over traditional heuristics, such as dispatching rules in dynamic scenarios.
科研通智能强力驱动
Strongly Powered by AbleSci AI