预防性维护
可靠性工程
时间范围
地铁列车时刻表
可靠性(半导体)
调度(生产过程)
约束(计算机辅助设计)
运筹学
最佳维护
计算机科学
计划维护
功能(生物学)
数学优化
工程类
运营管理
数学
生物
操作系统
进化生物学
物理
功率(物理)
量子力学
机械工程
作者
Kamran S. Moghaddam,John S. Usher
标识
DOI:10.1108/13552511011072916
摘要
Purpose This paper seeks to develop and present a new mathematical formulation to determine the optimal preventive maintenance and replacement schedule of a system. Design/methodology/approach The paper divides the maintenance‐planning horizon into discrete and equally‐sized intervals and in each period decide on one of three possible actions: maintain the system, replace the system, or do nothing. Each decision carries a specific cost and affects the failure pattern of the system. The paper models the cases of minimizing total cost subject to a constraint on system reliability, and maximizing the system reliability subject to a budgetary constraint on total cost. The paper presents a new mathematical function to model an improvement factor based on the ratio of maintenance and repair costs, and show how it outperforms fixed improvement factor models by analyzing the effectiveness in terms of cost and reliability of the system. Findings Optimal decisions in each period over a planning horizon are sought such that the objectives and the requirements of the system can be achieved. Practical implications The developed mathematical models for this improvement factor can be used in theoretical and practical situations. Originality/value The presented models are effective decision tools that find the optimal solution of the preventive maintenance and replacement scheduling problem.
科研通智能强力驱动
Strongly Powered by AbleSci AI