First Successful Deployment of Liner While Drilling Technology in Depleted Reservoir of Western Offshore India

钻探 海上钻井 石油工程 完井(油气井) 钻井液 井漏 海底管道 工程类 录井 海洋工程 岩土工程 机械工程
作者
Pawandeep Bagga,Sarang Pethe,Rakesh Gupta,Arpit Gupta
出处
期刊:SPE/IADC Middle East Drilling Technology Conference and Exhibition
标识
DOI:10.2118/214567-ms
摘要

Abstract The Mumbai High field in Western offshore of India presents major challenges to both drilling and liner running operations, because of reservoir being depleted and severe lost circulation conditions. Thus Liner while drilling, a new technology was deployed as a pilot Project to drill in these troublesome carbonate reservoir. The operator had previously experienced severe losses in the zone leading to big loss of rig days and damage to Reservoir due to LCM (Loss Circulation Materials) Pills. The liner while drilling service is a sustainable technology which combines 4.75in rotary steerable system BHA (Bottom Hole Assembly) with various logging tools, 8.75in hole opener/reamer, a mud motor, and a 7in liner with 8.5in reamer bit to help overcome the challenges while drilling in zones with low formation pressure and unstable formations. Running the liner while drilling helps maintain wellbore stability and reduces open hole exposure. It is also beneficial in reducing the time required by eliminating extra trips as the liner is installed at Target Depth in the first run. It is important to understand that Drilling with a mud motor and low RPM from surface is stressing the formation much less than conventional Rotary steerable BHA. Losses were contained with special mud additives. Plastering & smearing effect across the well bore added value in curing the Losses. This Technology Reduced formation damage by avoiding repeated LCM pills. Post Drilling, the inner string was Pulled out of hole leaving the liner at bottom which was later cemented with Cement Retainer. The technology proved to be Sustainable and with reduced HSE risk for the operator. The Paper will discuss in detail about the field of application, Prejob planning for Liner while Drilling Job, Onsite Execution and Successful completion of the well. This technology Successfully drilled, lowered, and Cemented 7in Liner at Target Depth saving rig time for the operator.
最长约 10秒,即可获得该文献文件

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
aa的应助被百分采纳,获得10
1秒前
highlights完成签到,获得积分10
1秒前
1秒前
1秒前
天涯勿忘归完成签到,获得积分10
2秒前
从容的丹南完成签到 ,获得积分10
2秒前
乐观紫霜发布了新的文献求助10
3秒前
4秒前
4秒前
Zhang发布了新的文献求助10
4秒前
yc完成签到,获得积分10
5秒前
5秒前
可研完成签到 ,获得积分10
5秒前
YoRHac完成签到 ,获得积分10
6秒前
可靠的大侠完成签到 ,获得积分10
7秒前
精明雁露发布了新的文献求助10
7秒前
7秒前
iidae发布了新的文献求助10
8秒前
科研通AI6.4的应助被风尘采纳,获得10
8秒前
8秒前
隐形的故事完成签到 ,获得积分10
12秒前
酷波er的应助被夜笛采纳,获得10
13秒前
notfound完成签到,获得积分10
13秒前
活性炭完成签到,获得积分10
14秒前
nader完成签到,获得积分10
14秒前
123完成签到,获得积分10
14秒前
zeng发布了新的文献求助10
14秒前
15秒前
iidae完成签到,获得积分10
17秒前
wxs完成签到 ,获得积分10
17秒前
精明雁露完成签到,获得积分10
17秒前
19秒前
19秒前
20秒前
coozrasimon发布了新的文献求助30
20秒前
20秒前
20秒前
科研通AI6.4的应助被朱丽君采纳,获得10
21秒前
爆米花的应助被CC采纳,获得30
22秒前
赘婿的应助被Zhang采纳,获得10
23秒前
高分求助中
(应助此贴封号)通过应助OA文献获取积分 10000
Rosenblum, Global Change Biology 800
Computational Chemical Reaction Engineering: Modeling, Simulation, and Design with MATLAB 600
Organizational Behavior 510
Management and the Arts 510
Production Logging: Theoretical and Interpretive Elements 400
CLSI C56QG Examples of Hemolyzed, Icteric, and Lipemic/Turbid Samples Quick Guide 400
热门求助领域 (近24小时)
化学 材料科学 医学 生物 计算机科学 工程类 纳米技术 内科学 物理 有机化学 化学工程 生物化学 复合材料 光电子学 细胞生物学 心理学 量子力学 催化作用 物理化学 电极
热门帖子
关注 科研通微信公众号,转发送积分 7815352
求助须知:如何正确求助?哪些是违规求助? 9344938
关于积分的说明 20526711
捐赠科研通 7408157
什么是DOI,文献DOI怎么找? 3330903
关于科研通互助平台的介绍 2477377
邀请新用户注册赠送积分活动 2350558