布莱顿循环
关闭
瞬态(计算机编程)
循环(图论)
闭环
TRIPS体系结构
涡轮机
钥匙(锁)
计算机科学
环境科学
核工程
工程类
航空航天工程
控制工程
计算机安全
操作系统
组合数学
数学
作者
Stefan D. Cich,J. Jeffrey Moore,Meera Day Towler,Jason Mortzheim,Douglas Hofer
出处
期刊:ASME Turbo Expo 2016: Turbomachinery Technical Conference and Exposition
日期:2019-06-17
被引量:5
摘要
Abstract Recent testing has been performed on a 1 MWe sCO2 closed loop recuperated cycle under funding from the US DOE Sunshot initiative and industry partners. Some of the goals of this funding included the development of a 1 MWe loop, a 10 MWe turbine, and performance and mechanical testing. One of the key challenges that presented itself was the filling, start-up, and shut down of the entire system. Understanding the loop transient performance is important when having to bring a turbine online, transitioning from peak to partial loading, and also managing routine and emergency shut downs. Due to large changes in density near the critical point for CO2 and its tendency to form dry ice when expanded to atmospheric pressure, managing loop filling and venting is critical in ensuring that components do not get damaged. Specific challenges were centered on protecting the dry gas seals, maintaining proper mass in the loop, and also thermal transients during trips. This paper will take a detailed look at the challenges encountered during start up and shut downs, and also the solutions that were implemented to successful transition between different phases of the testing.
科研通智能强力驱动
Strongly Powered by AbleSci AI