Sirada Kerdsiri,Somrawee Aramkul,Paskorn Champrasert
出处
期刊:2019 IEEE 6th International Conference on Industrial Engineering and Applications (ICIEA)
[Institute of Electrical and Electronics Engineers]
日期:2019-04-01
卷期号:: 898-902
被引量:4
标识
DOI:10.1109/iea.2019.8714919
摘要
The employee allocation and production scheduling are the key factors in manufacturing enterprises. Especially, in small and medium enterprises, the working employees are the main resources of the production process. The employees gain orientation in variety skills; they can be assigned to any processes. Moreover, when the employees work for a long period, the productivity drops because of their working fatigue. Thus, the initial flow shop scheduling plan may not result as expected. This paper proposes to apply the re-optimization process for employee allocation during the production period. However, the re-optimization requires the setup time to start the new process. The proposed model introduces the rescheduling checking procedure to properly invoke the optimization process. The genetic algorithm is applied in the optimization process. The evaluation results show that the proposed model can reduce the makespan with the suitable rescheduling optimization process.
科研通智能强力驱动
Strongly Powered by AbleSci AI