According to the construction practice of the Yunyang Yangtze River Highway Bridge, the demand for supervision surveying as well as its relevant technical measurements are introduced from the view of engineering surveying. Methods and precision in construction surveying are also analyzed, ensuring the bridge quality for the next construction period.