时间轴
自上而下和自下而上的设计
选择(遗传算法)
基础(拓扑)
持续时间(音乐)
计算机科学
比例(比率)
工业工程
工程类
运筹学
数学
统计
地理
软件工程
人工智能
艺术
数学分析
文学类
地图学
作者
Çetin Meral,Bayram Ali Temel,Hasan Basri Başağa
出处
期刊:Buildings
[Multidisciplinary Digital Publishing Institute]
日期:2024-08-01
卷期号:14 (8): 2381-2381
被引量:3
标识
DOI:10.3390/buildings14082381
摘要
The selection of an appropriate construction method stands as a pivotal decision in ensuring the success of any building project. This paper undertakes a comprehensive comparative analysis of cost and timeline implications between the top-down and bottom-up construction methodologies. The research focuses on ten distinct underground structure models, each characterized by varying depths and base areas. Through rigorous design and analysis, the cost and projected duration for each model are meticulously evaluated under the lens of both top-down and bottom-up construction techniques. The findings reveal that while the bottom-up approach emerges as the most cost-effective alternative at a depth of 8 m, the top-down method exhibits superior cost efficiency with increasing depth. Interestingly, alterations in the structure’s base area exert a minimal influence on the cost differentials between the two methodologies. Moreover, the top-down construction method consistently outshines its counterpart in terms of project duration across all ten models examined, with the percentage increase in base area yielding insignificant impacts on project timeline discrepancies. This study furnishes construction project managers with invaluable insights to navigate the complexities of method selection. By judiciously considering parameters such as project scale, depth, and base area, managers can strategically optimize both cost and timeline outcomes, thereby facilitating the seamless execution of construction projects.
科研通智能强力驱动
Strongly Powered by AbleSci AI