| 标题 |
Factors contributing to time delay and cost overrun in the construction of bridges along the Prithvi highway in Nepal
|
| 网址 |
求助人暂未提供
|
| DOI |
暂未提供,该求助的时间将会延长,查看原因?
|
| 其它 | Muchhara, V., & Dhungana, B. (2025, May). Factors contributing to time delay and cost overrun in the construction of bridges along the Prithvi highway in Nepal. In Parul University International Conference on Engineering and Technology 2025 (PiCET 2025) (Vol. 2025, pp. 1115-1120). IET. |
| 求助人 | |
| 下载 |
PDF的下载单位、IP信息已删除
(2025-6-4)