标题 |
![]() 智能硬路肩:当拥堵缓解满足安全
|
网址 | |
DOI |
暂未提供,该求助的时间将会延长,查看原因?
|
其它 | 会议论文,摘要:The junction between A3 & A86 highways around Paris (France) sees a 2-lane and a 4-lane highway merge onto a 4-lane wide and 700 meter long viaduct. The junction is a heavily congested area. This project aimed at optimizing the road capacity of the viaduct by removing the hard shoulder in order to create an infrastructure with 5 traffic lanes in each direction instead of 4. An Intelligent Transportation System was designed in order to keep a high level of safety for road users on a road section deprived of a hard shoulder but still experiencing a very dense traffic and a lot of lane switching. This innovative concept, referred to as "Intelligent hard shoulder" made use of: (1) Video surveillance CCTV system······ |
求助人 | |
下载 | 暂无链接,等待应助者上传 |