| 标题 |
Fit-For-Purpose Sweep Pumping Schedule to Improve Operation Efficiency While Achieving Effective Hole Cleaning During Clean Up Cycle at Well Total Depth in an Unconventional Drilling Operation |
| 网址 | |
| DOI | |
| 其它 |
期刊:International Petroleum Technology Conference 作者:G. Yin; S. W. Rogers; V. Q. Le 出版日期:2024 |
| 求助人 | |
| 下载 | 该求助完结已超 24 小时,文件已从服务器自动删除,无法下载。 |
PDF的下载单位、IP信息已删除
(2025-6-4)