堆
弯矩
岩土工程
发掘
结构工程
流离失所(心理学)
工程类
力矩(物理)
桩帽
垂直位移
心理学
经典力学
物理
心理治疗师
作者
Chang Xu,Haibin Ding,Wen Luo,Tong Li,Qing S. Chen,Jian L. Deng
标识
DOI:10.12989/gae.2020.20.3.255
摘要
Laboratory tests are conducted to investigate the performance of retaining system with different combinations of long-short piles. Numerical analysis implemented using ABAQUS are verified by comparing numerical results with measured data. By performing numerical studies, the horizontal displacement of piles, heave of excavation bottom and bending moment of pile for various pile system with different pile lengths are investigated. Results show that long piles share higher bending moments than short piles. The increase in the number of short piles leads to a slight increase in the heave at excavation bottom for long-short pile retaining system. Retaining system with different long and short pile combinations have greater effects on the horizontal displacement of pile above the excavation bottom, compared to its counterparts below excavation bottom. For a given length of long pile, the bending moment and displacement of piles increase with the decrease in length of short piles, while the increasing rate of maximum moment of retaining pile system is insignificant. Results highlight that a reliable and economical pile retaining system can be designed by optimizing the number and length of short piles, provided that the working performance of retaining structures above excavation bottom meets the design requirement in practice.
科研通智能强力驱动
Strongly Powered by AbleSci AI