Container terminals play an important role in container transportation, including shipping and land transportation. In particular, container yard management, which involves diverse operational services, significantly affects the operational efficiency of the entire container terminal. However, there is a major omission in existing work, viz., it is imperative to attain an effective workload scheduling to support the dynamic deployment of yard cranes. Based on these understandings, the proposed system aims at postulating a novel strategy in terms of yard crane scheduling. In this manner, a dynamic allocation model is initially developed based on the integer programming for yard cranes. To resolve the NP-hard problem regarding the yard crane deployment, a heuristic algorithm, especially the hill-climbing algorithm, is then employed. Finally, a case study on a certain container terminal yard has been used for system illustration via a simulation approach.