计算机科学
控制重构
过程(计算)
解算器
调度(生产过程)
整数规划
线性规划
断层(地质)
流量网络
运筹学
数学优化
分布式计算
工程类
嵌入式系统
地质学
地震学
算法
程序设计语言
操作系统
数学
作者
Yan Wang,Wei Li,Yongxiang Cai,HE Hong-yan,Shuhui Pan,Miao Mao,Zihong Song
标识
DOI:10.1109/icpsasia58343.2023.10294919
摘要
In the process of post-disaster recovery, the distribution network and the transportation network are closely related. The resource transportation of the distribution network needs to be realized by the transportation network, and the normal operation of the transportation facilities also requires that the distribution network can supply electricity normally. Therefore, this paper proposes a fault repair strategy considering the integration of distribution network and transportation network. The paper takes resource scheduling as the optimization variable, and takes the maximum load and road traffic recovery within a specified time as the objective function, and expresses the recovery process as a mixed integer linear programming model, and network reconfiguration is considered in the recovery process to ensure the user's electricity demand. The optimal policy can be obtained by solving the model with the solver. Finally, the conclusion is drawn by using the data of IEEE-33 nodes to verify the calculation example.
科研通智能强力驱动
Strongly Powered by AbleSci AI