硅铁
铁合金
锰铁
冶金
锰
冶炼
焦炭
感应炉
材料科学
电弧炉
合金
作者
Viktor Shevko,D.K. Aitkulov,Alexandra Badikova,M.A. Tuleyev
出处
期刊:Комплексное использование минерального сырья
[Institute of Metallurgy and Ore Benefication]
日期:2021-09-12
卷期号:318 (3): 43-50
被引量:5
标识
DOI:10.31643/2021/6445.27
摘要
The article presents the results of studies on the influence of time, the amount of steel shavings and coke on the electric melting of ferrosilicon manganese dusts to obtain a ferroalloy. The research was carried out by the method of rotational planning of the second order (Box-Hunter plans) and by electric smelting of dust in laboratory ore-thermal arc furnace. Dust from the production of ferromanganese by LLP Taraz Metallurgical Plant, coke and steel shavings were used during the research. It was determined that to achieve αSi≥70%the process must be carried out in the presence of 25% coke and 8.1-9% steel shavings from the mass of dust for 55.8-60 minutes, to achieve αMn in an alloy of 80-85% the process must be carried out in the presence of 25% coke, 5.7-9.0% steel shavings for 41.2-54.4 minutes. When melting the charge containing 75.2% of dust, 18.8% of coke, 6% of steel shavings, within 60 minutes the weight of the ferroalloy was 258 g (38.8% of the weight of the charge or 51.6% of the weight of dust). The degree of extraction of manganese into the alloy was 82.3%, silicon - 66.1%. The resulting ferroalloy belongs to ferrosilicon manganese of the FeMnSi12 grade.
科研通智能强力驱动
Strongly Powered by AbleSci AI