采购
提前期
过程(计算)
质量(理念)
还原(数学)
模糊逻辑
计算机科学
铅(地质)
集合(抽象数据类型)
运筹学
过程管理
工业工程
工程类
运营管理
业务
数学
人工智能
地质学
程序设计语言
营销
哲学
地貌学
操作系统
认识论
几何学
作者
Matina Ghasemi,Mazyar Ghadiri Nejad,Naif Alsaadi,Mu’tasim Abdel-Jaber,Mohd Shukri Ab Yajid,Md. Mamun Habib
摘要
To characterize the process of lead-time reduction in EPC project-based organizations, including the engineering, procurement, and construction activities, various elements such as organizational issues, firm resources, used methods and techniques, and performance measuring tools are important. In this study, the four mentioned elements are evaluated through a survey in different EPC project-based organizations. The survey is sent to only experts and managers who are involved in EPC projects, and the obtained data is used to test the relationship between the mentioned variables and the lead time of developing new products. This evaluation is followed by a set of generalized lessons learned and courses of action to improve the development process. Additionally, the attributes of performance measurement in such projects are scrutinized. Therefore, to analyze the impacts of the mentioned variables and their variations on the performance measurement, a mathematical model based on the fuzzy approach is developed. The results show that all of the four considered variables are correlated to the lead time and affect the quality perceived by the main client and the cost of the project. Moreover, data obtained from the proposed mathematical formulations illustrated that the fuzzy modeling approach is an effective method to predict the performance measurement level when the levels of the input variables are given.
科研通智能强力驱动
Strongly Powered by AbleSci AI