Analysis the costs and causes of change order in Iraqi projects: A comprehensive survey and BIM approach

订单(交换) 变更通知单 计算机科学 风险分析(工程) 系统工程 业务 工程类 项目管理 项目管理 OPM3 财务
作者
Dhyaalden H. Ali,Abdulrahman Adnan Ibrahim,Bevian Ismail Al Hadithi
出处
期刊:Nucleation and Atmospheric Aerosols [American Institute of Physics]
卷期号:3229: 030006-030006
标识
DOI:10.1063/5.0236156
摘要

This study focuses on a prominent challenge in Iraqi construction projects, specifically in the government sector, focusing on change orders. These orders lead to increased costs and project delays. The study revolves around a recently completed government project that involved the construction of multiple schools. The research endeavors to pinpoint the key factors contributing to the escalation of change orders, considering the various stages of the project, to ensure effective control and minimize their impact. The research methodology comprised collecting project information, documents, and records, followed by on-site surveys of numerous public and private projects to identify influential factors. Following this, an extensive questionnaire was disseminated to collect responses, and the gathered data were analyzed utilizing both Excel and SPSS. A detection technique was employed to transform architectural and structural drawings from two to three dimensions. Subsequently, these were exported to Navisworks for analysis. The study revealed cost overruns exceeding 20% due to change orders in both schools. Finishing and frontage designs exhibit the highest percentage increases. The results indicate that added items constitute 77% of change order costs. Furthermore, design phases contribute to 52% and 70% of the total change order costs for both schools. The responses from 165 participants emphasized five crucial factors: insufficient project evaluation before the design phase, subpar project management during implementation, price variations during execution compared with estimated costs, inadequate selection of subcontractors, and errors in estimation or insufficient cost estimation. The findings suggest that incorporating BIM technology in the design phases can cut change orders by half, resulting in a roughly 50% reduction in overall change order costs. Additionally, it improves project efficiency and accelerates the project timeline. The study pinpointed the factors driving increased change orders in Iraqi projects, stressing the need for early BIM adoption for comprehensive solutions. The emphasis on accurate estimation, site assessments, effective management, and meticulous verification is crucial.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
刚刚
刚刚
1秒前
Hart完成签到,获得积分0
1秒前
天天快乐的应助被小唐采纳,获得10
1秒前
糜康发布了新的文献求助10
1秒前
Lucas的应助被wynneri采纳,获得10
1秒前
2秒前
StrawCc完成签到 ,获得积分10
2秒前
英勇白莲发布了新的文献求助10
2秒前
佳妮发布了新的文献求助10
3秒前
搜集达人的应助被王富臻采纳,获得10
3秒前
3秒前
3秒前
火星上源智完成签到,获得积分10
4秒前
Sissi发布了新的文献求助10
5秒前
Zhu发布了新的文献求助10
5秒前
Moonber发布了新的文献求助10
5秒前
5秒前
顾矜的应助被xing525888采纳,获得10
5秒前
6秒前
6秒前
6秒前
6秒前
6秒前
6秒前
小舒发布了新的文献求助10
7秒前
7秒前
7秒前
7秒前
李治博发布了新的文献求助10
8秒前
8秒前
nadeem发布了新的文献求助10
8秒前
9秒前
得翁董发布了新的文献求助10
9秒前
科目三的应助被阿诺采纳,获得10
10秒前
Srishti完成签到,获得积分10
10秒前
10秒前
10秒前
ou发布了新的文献求助10
11秒前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
拉伸高分子熔体中缠结行为的模拟和小角中子散射研究 2000
Handbook of Sport Coaching Research 1000
Orthognathic Surgery - 2 Volume Set 500
高分子基功能界面水蒸发材料与应用研究 500
外场增强的水汽发电研究 500
基于结构调控的功能化水诱导发电材料与器件研究 500
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 计算机科学 工程类 有机化学 化学工程 生物化学 物理 复合材料 内科学 催化作用 光电子学 人工智能 细胞生物学 无机化学 物理化学 数学
热门帖子
关注 科研通微信公众号,转发送积分 8198907
求助须知:如何正确求助?哪些是违规求助? 9584192
关于积分的说明 21893250
捐赠科研通 7800536
什么是DOI,文献DOI怎么找? 3439107
关于科研通互助平台的介绍 2562100
邀请新用户注册赠送积分活动 2486071