菱镁矿
空气预热器
煅烧
窑
流化床
废物管理
材料科学
能源消耗
工艺工程
环境科学
冶金
化学
工程类
镁
催化作用
生物化学
电气工程
作者
Ping An,Zhennan Han,Kangjun Wang,Jiguang Cheng,Zhongkai Zhao,Yohanes Andre Situmorang,Jenny Rizkiana,Abuliti Abudula,Guoqing Guan
标识
DOI:10.1016/j.crcon.2021.03.004
摘要
A transport bed flash calcination (TBFC) process applied to magnesite is systematically investigated through process simulation to optimize the energy-saving strategy. The high-temperature calciner flue gas is used to preheat the fed magnesite, while the sensible heat with the caustic calcined magnesia (CCM) product is cooled by air sent to the calciner. Pre-decomposition of magnesite during preheating is considered on basis of the kinetics measured using a micro fluidized bed reaction analyzer that allows the minimized effect of external diffusion on reaction. With staged fuel gas supply the TBFC process allows the equivalence ratios around 1.2 for combustion. The preferred arrangement of stages for magnesite preheating and CCM cooling are respectively 4 and 2, leading to the energy consumption of 4100 kJ/kg-CCM and the energy efficiency of 66.8%, which is almost doubly higher than the 33.9% of the conventional reverberatory furnaces (RF). The pre-decomposition occurs mainly in the 1st-stage preheater, and the maximal conversion is about 13%. Varying the stages of preheating appears more influential on the energy saving than varying the cooling stages, while residence time above 1 s in the preheaters has limited effect.
科研通智能强力驱动
Strongly Powered by AbleSci AI