清晨好,您是今天最早来到科研通的研友!由于当前在线用户较少,发布求助请尽量完整地填写文献信息,科研通机器人24小时在线,伴您科研之路漫漫前行!

What leads to the high capital cost of prefabricated construction in China: perspectives of stakeholders

交易成本 利益相关者 一致性(知识库) 业务 晋升(国际象棋) 控制(管理) 环路图 知识管理 风险分析(工程) 计算机科学 经济 财务 系统动力学 政治 人工智能 管理 法学 政治学
作者
Yu Liu,Ruidong Chang,Jian Zuo,Feng Xiong,Na Dong
出处
期刊:Engineering, Construction and Architectural Management [Emerald Publishing Limited]
卷期号:30 (2): 805-832 被引量:29
标识
DOI:10.1108/ecam-06-2021-0538
摘要

Purpose Prefabricated construction (PC) will play a vital role in the transformation and upgrading of the construction industry in the future. However, high capital cost is currently one of the biggest obstacles to the application and promotion of PC in China. Clarifying the factors that affect the PC cost from the perspectives of stakeholders and exploring key cost control paths help to achieve effective cost management, but few studies have paid enough attention to this. Therefore, this research aims to explore the critical cost influencing factors (CIFs) and critical stakeholders of PC based on stakeholder theories and propose corresponding strategies for different stakeholders to reduce the cost of PC. Design/methodology/approach Based on the stakeholder theory and social network theory, literature review and two rounds of expert interviews were used to obtain the stakeholder-associated CIFs and their mutual effects, then the consistency of the data was tested. After that, social network analysis was applied to identify the critical CIFs, critical interaction and key stakeholders in PC cost control and mine the influence conduction paths between CIFs. Findings The results reveal that the cognition and attitude of developer and relevant standards and codes are the most critical CIFs while the government, developer and contractor are crucial to the cost control of PC. The findings further suggest that measures should be taken to reduce the transaction costs of the developer, and the contractor ought to efficiently apply information technology. Moreover, the collaborative work between designer and manufacturer can avoid unnecessary cost consumption. Originality/value This research combines stakeholder management and cost management in PC for the first time and explores the effective cost control paths. The research results can contribute to clarifying the key points of cost management for different stakeholders and improving the cost performance of PC projects.

科研通智能强力驱动
Strongly Powered by AbleSci AI
科研通是完全免费的文献互助平台,具备全网最快的应助速度,最高的求助完成率。 对每一个文献求助,科研通都将尽心尽力,给求助人一个满意的交代。
实时播报
kingwill完成签到,获得积分0
2秒前
loii举报Bouuu求助涉嫌违规
10秒前
游艺完成签到 ,获得积分10
27秒前
知秋完成签到 ,获得积分10
50秒前
星辰大海应助精明纸鹤采纳,获得10
52秒前
alan完成签到 ,获得积分0
53秒前
河鲸完成签到 ,获得积分10
53秒前
月上柳梢头A1完成签到,获得积分10
55秒前
1分钟前
天真的乌完成签到 ,获得积分10
1分钟前
Bob完成签到 ,获得积分10
1分钟前
1分钟前
lb001完成签到 ,获得积分10
1分钟前
loii举报可耐的访梦求助涉嫌违规
1分钟前
MS903完成签到 ,获得积分10
1分钟前
Criminology34完成签到,获得积分0
2分钟前
2分钟前
Gideon完成签到,获得积分10
2分钟前
司空勒完成签到,获得积分10
2分钟前
司空勒发布了新的文献求助50
2分钟前
Thunnus001完成签到 ,获得积分10
3分钟前
kyt完成签到,获得积分10
3分钟前
智者雨人完成签到 ,获得积分10
3分钟前
3分钟前
LXQ发布了新的文献求助10
3分钟前
FashionBoy应助科研通管家采纳,获得10
3分钟前
话说dota完成签到 ,获得积分10
3分钟前
忘忧Aquarius完成签到,获得积分0
4分钟前
oscar发布了新的文献求助10
4分钟前
4分钟前
醒了没醒醒完成签到 ,获得积分10
4分钟前
兴奋千秋发布了新的文献求助10
4分钟前
Guorsh完成签到 ,获得积分10
4分钟前
高山流水完成签到 ,获得积分10
4分钟前
loii举报ling求助涉嫌违规
4分钟前
脑洞疼应助精明纸鹤采纳,获得10
5分钟前
5分钟前
aaa完成签到,获得积分10
5分钟前
xc完成签到,获得积分10
5分钟前
精明纸鹤发布了新的文献求助10
5分钟前
高分求助中
(应助此贴封号)【重要!!请各用户(尤其是新用户)详细阅读】【科研通的精品贴汇总】 10000
The Organometallic Chemistry of the Transition Metals 800
Chemistry and Physics of Carbon Volume 18 800
The Organometallic Chemistry of the Transition Metals 800
Leading Academic-Practice Partnerships in Nursing and Healthcare: A Paradigm for Change 800
The formation of Australian attitudes towards China, 1918-1941 640
Signals, Systems, and Signal Processing 610
热门求助领域 (近24小时)
化学 材料科学 医学 生物 纳米技术 工程类 有机化学 化学工程 生物化学 计算机科学 物理 内科学 复合材料 催化作用 物理化学 光电子学 电极 细胞生物学 基因 无机化学
热门帖子
关注 科研通微信公众号,转发送积分 6436657
求助须知:如何正确求助?哪些是违规求助? 8251025
关于积分的说明 17551342
捐赠科研通 5494952
什么是DOI,文献DOI怎么找? 2898207
邀请新用户注册赠送积分活动 1874890
关于科研通互助平台的介绍 1716139