Tomáš Hanák,Michal Mikulík,Marcin Soniewicki
出处
期刊:International Journal of Managing Projects in Business
[Emerald Publishing Limited]
日期:2025-05-19
卷期号:18 (8): 79-99
被引量:1
标识
DOI:10.1108/ijmpb-12-2024-0325
摘要
Purpose Before selecting a contractor and commencing construction work, creating documentation that describes the facility to be built is needed. Often, this documentation contains a large number of errors and deficiencies of significance. This study analyses a model comprising four latent variables and explores how three specific constructs – communication and change management (COM), project documentation supervision (PRS), and quality of technical specifications in the tender documentation (QTS) – contribute to construction project success (SPR). Design/methodology/approach The original data were collected from experienced Czech construction implementation professionals. A survey was conducted using an online questionnaire. Partial least squares structural equation modelling was used for analysis. Findings Both advanced COM and effective and thorough PRS positively affect SPR in the context of the time-, cost-, and quality-related concepts of the Iron Triangle. The quality of the technical specifications of tender documentation serves as an important mediating variable suggesting an independent review of this documentation before it is used for contractor selection. Originality/value In contrast to prior research, this study aims to elucidate the significance of documentation quality in relation to project success during the initial phase. The delivery and subsequent approval of documentation are posited as critical milestones that influence the performance dimensions of the iron triangle, namely, scope, time, and cost. Therefore, we argue that communication and change management should be central, primarily in the pre-investment phase, to ensure ideal error-free documentation.
科研通智能强力驱动
Strongly Powered by AbleSci AI