危险和可操作性研究
故障树分析
可操作性
事件树
可靠性工程
失效模式及影响分析
灵活性(工程)
风险分析(工程)
工程类
危害
风险管理
业务
财务
统计
有机化学
化学
数学
作者
Deswandri Deswandri,Sudarno Sudarno,Ratih Luhuring Tyas,Anggraini Ratih Kumaraningrum,Restu Maerani,Ibnu Maulana Hidayatullah,Muhamad Sahlan,Azmi Mohd Shariff,Heri Hermansyah
摘要
Abstract Integral Pressurized Water Reactor (IPWR) is gaining attention for use in Indonesia due to lower initial capital investment, sitting flexibility, and high level of inherent safety. IPWR relies heavily on passive cooling systems that have many advantages but lacks operational experience because no one operates commercially. Therefore, it is necessary to carry out a risk analysis related to passive cooling system failures that may occur during operation. Even if conventional risk analysis methods are applied singularly, the results still have shortcomings. This study aims to integrate the use of the Hazard and Operability Analysis (HAZOP), Fault Tree Analysis (FTA), and Failure Mode and Effect Analysis (FMEA) methods to identify risks in the IPWR primary cooling system during normal operation. HAZOP was used to identify hazards, FTA analyzed the root causes of the critical problems, and the basic event's FMEA was developed for risk ranking and mitigation measures. This combined methodology makes risk assessment more systematic and comprehensive because it manages entity‐wide risk. The results offer valuable insights for stakeholders involved in decision‐making regarding the development of nuclear power plants (NPPs) in Indonesia.
科研通智能强力驱动
Strongly Powered by AbleSci AI