曝气
废水
化学需氧量
硝化作用
化学
制浆造纸工业
污水处理
环境工程
环境化学
氮气
环境科学
有机化学
工程类
作者
Tülay Yılmaz,Emir Kasım Demir,Senem Teksoy Başaran,Emine Ubay Çokgör,Erkan Şahinkaya
标识
DOI:10.1016/j.jwpe.2023.103886
摘要
Uncontrolled discharge of textile industry wastewater, defined by its highly toxic content, causes serious problems in receiving environment. Especially nitrogen-derived pollutants in wastewater threaten the ecosystem and aquatic life. Separate or simultaneous nitrification/denitrification is the preferred biological processes for removing nitrogen-based pollutants from wastewater. This study aimed to evaluate the impact of aeration on/off cycle durations on organic matter, color, and nitrogen removal performances in an intermittently aerated membrane bioreactor (MBR) receiving real textile wastewater. For this purpose, the MBR was operated under different dissolved oxygen concentrations (6 and 3 mg/L) and the aeration on/off cycle durations (from 2 min/2 min to 90 min/360 min) at a constant flux of 10 L/(m2.h). While the chemical oxygen demand (COD) removal performance ranged from 84 to 91 %, the color removal efficiencies were highly variable. Nitrification performance of ≥89 % was achieved with a minimum of 30 min aeration cycles. The highest denitrification efficiency was obtained in the cycle with 360 min aeration-off duration. Intermittent aeration provided higher TN removal, less sludge generation, and lower energy requirements for aeration. The impacts of aeration cycle duration on membrane filtration performance and foulant characterization were also investigated by Fourier transform infrared spectroscopy (FT-IR), scanning electron microscopy (SEM), gel-permeation chromatography (GPC), SEM coupled with energy dispersive spectroscopy (SEM-EDS), particle size distribution (PSD) analyses.
科研通智能强力驱动
Strongly Powered by AbleSci AI